NOTE: As of 01/11/24, estimated lead times are 5-7 Weeks unless otherwise noted.
This manifold features a turbo flange facing straight out with a single divided wastegate port centered on the turbo flange.
Product Details
NOTE: As of 01/11/24, estimated lead times are 5-7 Weeks unless otherwise noted.
This manifold features a turbo flange facing straight out with a single divided wastegate port centered on the turbo flange.